Planning And Managing A Software Project

I INITIAL PLANNING

  1. 1. Introduction
    1. 1.1 Course Overview
    2. 1.2 Software Process as the Framework for Software Engineering Preface
    3. 1.3 Facts and Myths about Software Engineering
    4. 1.4 Overview of the Planning Process
  2. 2. Lifecycle Models
    1. 2.1 A General Model of a Lifecycle
    2. 2.2 The Project Lifecycle
    3. 2.3 The System Engineering Lifecycle
    4. 2.4 The Software Development Lifecycle
  3. 3. Initial Planning 6
    1. 3.1 Overview
    2. 3.2 Understanding the Customer and the Requirements
    3. 3.3 Defining the Approach
    4. 3.4 Analyzing the Environment
    5. 3.5 Selecting Process and Methods

II. DETAILED PLANNING 6

  1. 4. Detailed Planning Overview and The Work Breakdown Structure
  2. 5. Size Estimates -- Lines of Code / Function Points
  3. 6. Effort and Cost Analysis
  4. 7. Scheduling
  5. 8. The Software Development Plan
    1. 8.1 Contents of a Software Development Plan
    2. 8.2 Documentation

III OTHER MANAGEMENT ACTIVITIES

9. Risk Management 5,6

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

9.1 Risk Management Process

A_LINK

9.2 Risk Assessment

9.3 Risk Control

9.4 Risk Examples

A_LINK

9.5 Risk Management Plan

10. Measuring and Monitoring 6,15

A_LINK

A_LINK

10.1 Overview

10.2 Basic Issues

10.3 Selection of Metrics

A_LINK

10.4 Recommended Metrics for a Software Manager

10.5 Issues with Metrics

11. Configuration Management 7, 12

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

11.1 The Need for Configuration Management

A_LINK

11.2 Configuration Management Functions

11.3 Configuration Management Responsibilities

11.4 Practical Problems

12. Software Quality Engineering and Assurance 8

A_LINK

A_LINK

Managing Quality 16

A_LINK

A_LINK

A_LINK

Engineering Quality 9,10

Software Testing 11

IV SOFTWARE PROCESS MATURITY

13 Software Process Maturity, Assessment and Improvement 1,2,3,4

13.1 Software Process Maturity

A_LINK

13.2 The SEI Capability Maturity Model (CMM)

A_LINK

A_LINK

13.3 Reviewing the Five Levels

A_LINK

A_LINK

A_LINK

A_LINK

13.4 Details of Level 2

13.5 Assessment

14 Continuous Process Improvement 13,14,17

A_LINK

A_LINK

A_LINK

A_LINK

MISC

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK

A_LINK